Al Jazeera Tower


2021

Sharjah

MEP

TTE engineering recently completed and handed over SEWA’s pilot project for the Al Jazeera Tower located in Sharjah for Water Meter Digitalization. The project demanded design, supply, installation, testing and commissioning of a total of 229 sub-meter water meters and one bulk meter for the G+P3+16+Roof residential building. Apart from these, water supply pipes and accessories, wiring and looping between all floors, as well as the supply and installation of enclosures for Mbus Master with M2M Router and SD card was provided by the team. The planned duration for project completion was four weeks, however, with efficient planning and coordination the team was able to complete and handover the project within 15 days.